Deep beneath our feet flows a hidden river. This river isn’t made of fresh water. It’s made of sewage. This is the story of Ting Kok Road Sewage Pumping Station No.6. It’s a vital part of Hong Kong’s infrastructure.
Ting Kok Road Sewage Pumping Station No.6 helps to manage wastewater. It ensures our city stays clean and healthy. The pumping station is not just one facility. It’s part of a larger network. This network includes pumping stations and sewers along Ting Kok Road.
The government saw the need for upgrades. They planned to improve the system to handle future growth. The Drainage Services Department knew it needed to act. The existing system was nearing its capacity. Population growth would strain the system. New developments would add to the load. Villages needed proper sewerage.
In 2018, the Legislative Council Panel discussed the upgrade. The goal was to increase capacity. The old system could handle 11500 cubic meters per day. The upgraded system would handle 22000 cubic meters per day. This would serve a projected population of 64000.
The project included several key components. Three new sewage pumping stations were built. These were Ting Kok Road Sewage Pumping Station Nos. 5, 7 and 8. Three existing stations were demolished. About 4.2 kilometers of rising mains were constructed. Around 2.1 kilometers of gravity sewers were also added.
AECOM Asia Company Limited played a vital role. They handled the investigation, design and construction supervision. Shanghai Construction Overseas Engineering Ltd. was awarded a contract. The contract was worth about $267 million.
Construction commenced on February 28, 2019. The original completion date was December 30, 2023. The entire project cost about $847 million.
Environmental concerns were a priority. The project was carefully assessed. Measures were taken to minimize noise and dust. Water spraying was used. On-site runoff was treated. The new stations were equipped with deodourisation units. Exhaust fans had acoustic louvres.
The project also focused on waste management. Construction waste was reused whenever possible. Inert waste was sent to public fill reception facilities. Non-inert waste went to landfills.
The upgrading of Ting Kok Road Sewage Pumping Station No.6 demonstrates Hong Kong’s commitment. The city protects public health and the environment. It’s a story of planning, engineering and environmental stewardship. Next time you flush a toilet, remember Ting Kok Road Sewage Pumping Station No.6. It is working hard behind the scenes.