Slipping through the heart of Eagle’s Nest mountain, the Eagle’s Nest Tunnel is more than just a passage. It’s a marvel of engineering and a testament to Hong Kong’s ambition. Right here, beneath the watchful gaze of the Eagle’s Nest itself, we stand at the entrance to this modern marvel. Opened on March 21, 2008, the Eagle’s Nest Tunnel is a key part of Route 8, the Tsing Sha Highway. It stretches 2.1 kilometers, carrying six lanes of traffic through the mountain. Imagine the feat of boring through solid granite to create this vital artery. The Eagle’s Nest Tunnel doesn’t stand alone. It’s partnered with the Sha Tin Heights Tunnel, and together they form a seamless link between Cheung Sha Wan and Tai Wai. A shared toll plaza connects these two tunnels, streamlining the journey and costing a mere HK$8 for private cars. The construction of the Eagle’s Nest Tunnel was a significant undertaking. A joint venture between Leighton Asia and Kumagai Gumi brought this vision to life, starting in October 2003. The project, costing HK$1.84 billion, involved not only the twin tunnels but also a 400-meter ventilation shaft, portal buildings, a ventilation building off Tai Po Road, and even a three-story administration building. Five advanced Tamrock Axera tunnelling jumbos were employed in the construction. One, a two-boom jumbo with computer-aided drilling, tackled the ventilation shaft. Four others, three-boom, fully computerized jumbos, worked in tandem within the main tunnel. Picture these massive machines carving their way through the rock, creating a space 11.8 meters high and 16.3 meters wide. The Eagle’s Nest Tunnel stands as a symbol of progress, connecting communities and facilitating the growth of the northeast New Territories. It’s a hidden wonder, a testament to human ingenuity, and a vital part of Hong Kong’s dynamic infrastructure.
Центральный дом работников искусств
Step through the grand wooden doors of the Central House of the Workers of Art, and you’ll be transported to