Amidst the serene landscape of South Lantau Road, the Pui O No.2 Raw Water Pumping Station stands as a vital part of Hong Kong’s water infrastructure. The Pui O No.2 Raw Water Pumping Station plays a crucial role in ensuring a reliable water supply for Hong Kong. It’s part of a larger network that includes the Shek Pik Reservoir and Siu Ho Wan Water Treatment Works. The station’s capacity, along with the original Pui O Raw Water Pumping Station, has been upgraded to a combined 460,000 cubic meters per day. This upgrade is a component of the Siu Ho Wan water treatment works extension project (9373WF). This massive undertaking, with a budget exceeding $3.6 billion, aims to double the treatment capacity of the Siu Ho Wan facility. The project, which also involves constructing a new booster pumping station and laying new water mains, began in March 2022 and is slated for completion in the fourth quarter of 2027. The Pui O No.2 Raw Water Pumping Station upgrade is specifically covered under Contract No. 18/WSD/21. This contract utilizes the NEC4 ECC Option D, a collaborative contracting model that fosters shared risk and reward between the Water Supplies Department and the contractor. So, the next time you enjoy a glass of water in Hong Kong, remember the Pui O No.2 Raw Water Pumping Station and the intricate network that brings this precious resource to you.
Центральный дом работников искусств
Step through the grand wooden doors of the Central House of the Workers of Art, and you’ll be transported to