Perhaps a subtle shift from city noise to a softer hum hints at something special. That something is Lisière Pereire. This isn’t just another spot in Saint-Germain-en-Laye. It’s a vision made real.
Lisière Pereire stands as a testament to innovative urban planning. It demonstrates how a space can be both functional and beautiful. The project started back in 2011. Work began in 2013. By 2016, the first spaces and buildings were ready. The final touches are expected in 2024.
Lisière Pereire arose from a former railway and logistics wasteland. The city saw this as a unique chance. It was the last large piece of land available. It sits close to the forest. The location has great transport links. The city started planning its future in 2005. They included specific development goals in their local urban plan. The aim was to create a smooth transition from forest to city.
The planners focused on three main ideas. First, a compact city. This means using land wisely and building densely. Second, an intense city. This means mixing different activities and social groups. It also means encouraging interaction between people. Third, a natural city. This means creating an exceptional environment. It means valuing the existing landscape. It means protecting biodiversity. It means building in an environmentally responsible way.
The vision for Lisière Pereire was a sustainable neighborhood. The idea was to blend different uses into one space. It mixes living and working. It combines public life and private space. It merges city and nature.
A key goal was to give the forest back to the residents. The planners aimed to enhance the landscape. They adapted it to the urban setting. Natural elements of the forest inspired them. They borrowed from the town’s iconic features like Lenôtre’s Terrace. They created new spaces and landscapes. They remained closely connected to the surroundings.
The project included demolishing old buildings. It also involved cleaning up pollution. The construction cost a total of 3.7 million euros. The work also included creating public spaces. The cost for this was 30 million euros. A tunnel under the train tracks cost 4.8 million euros.
The project includes a new road network. This provides access from the east and west. A wide promenade overlooks the forest. There are two pedestrian squares. Key features include an underpass for trucks. There is also an underground parking area with 200 spaces.
OGI played a key role in this transformation. They managed the demolition. They removed hazardous materials. They secured the site. They reduced noise and dust. They sorted waste carefully. They crushed concrete on-site. This was then recycled for fill. OGI also managed soil cleanup. They ensured proper waste disposal. They checked the impacted areas. They managed their removal.
OGI also conducted feasibility studies. They oversaw the construction. This included roads, utilities and civil engineering. They managed rainwater collection. They controlled water runoff. They addressed environmental concerns. They created green spaces. They developed a cycling network. They engineered a tunnel under the railway lines. They built retaining walls. They installed stormwater basins. They constructed a pumping station.
Lisière Pereire demonstrates how to create a new, sustainable neighborhood. It is a place where people can live, work and enjoy nature. It is a model for future urban development. Take a moment to appreciate how Lisière Pereire blends city living with the tranquility of nature.