What if a building could whisper secrets of Hungary’s energy future? Here at MOL Campus, the tallest building in Budapest, glass and steel rise 143 meters into the sky, a testament to modern architectural ambition. MOL Campus isn’t just a skyscraper. It’s the beating heart of MOL Group, completed in 2022. This 28-story giant brings together 2,500 employees who were previously scattered across nine different locations in Budapest. The building, designed by Foster + Partners and FintaStudio, is a symbol of unity and efficiency for the company. MOL Campus embraces sustainability. Its geothermal heating and cooling system, powered by over 300 probes reaching 120 meters deep, provide a significant portion of the building’s energy needs. The roof, adorned with 900 square meters of solar panels, further reduces the building’s carbon footprint. Even rainwater and greywater are recycled, minimizing water waste. Inside, MOL Campus is a hub of activity. The interior design promotes collaboration with an activity-based working model, allowing employees to choose workspaces suited to their tasks. Gardens and green spaces weave through the building, from the central atrium to sky gardens and a public rooftop garden. Imagine stepping into this green oasis high above Budapest. This futuristic workspace offers not only a panoramic view of the city, but also restaurants, a visitor center, and even a Fresh Corner. MOL Campus embodies a vision of a future where sustainability and innovation drive progress. This building isn’t just a headquarters. It’s a symbol of Hungary’s energy future, a beacon of modern architecture, and a testament to MOL Group’s commitment to a greener tomorrow.
Центральный дом работников искусств
Step through the grand wooden doors of the Central House of the Workers of Art, and you’ll be transported to