Journey back to a time when steam ruled the rails. Imagine standing before the mighty Class JS 2-8-2 Locomotive, a symbol of China’s industrial prowess. The Class JS 2-8-2 Locomotive wasn’t just a train; it was a testament to Sino-Soviet collaboration in the 1950s. The design ingeniously combined the robust chassis of the China Railways JF with a new boiler, inspired by Soviet engineering. This fusion created a powerful mixed-traffic locomotive, ready to tackle both mainline service and heavy shunting. The Class JS 2-8-2 Locomotive was equipped with mechanical stokers and feedwater heaters. These features significantly boosted its power compared to its predecessors. Production began in 1957 at the Dalian locomotive works. Later, Qishuyan, Datong, and Beijing (Feb 7th) also joined the manufacturing effort. Between 1957 and 1965, an impressive 1135 locomotives were built. After a pause, production resumed in 1981 at Datong. By 1986, 358 more engines had been built to the original design. Then came the revised JS “B” specification, with modifications for easier maintenance and better suitability for trip working and shunting. A total of 423 JS “B” locomotives rolled off the production line before steam production ceased at Datong in December 1988. Interestingly, the very last JS, number 8422, was completed in December 1988. Another engine, originally intended as a works pilot and numbered JS 9999, later became JS 8423 and was sold to industry. The Class JS 2-8-2 Locomotive played a crucial role in China’s railway history. It stands as a reminder of a bygone era of steam power and international cooperation.
Центральный дом работников искусств
Step through the grand wooden doors of the Central House of the Workers of Art, and you’ll be transported to