Opened in 2012, the Wuliqiao Vehicle Depot is more than just a parking lot for Beijing Subway Line 6 trains. It’s a vital organ, ensuring smooth daily operations. This Wuliqiao Vehicle Depot, nestled in Beijing’s Chaoyang District, has seen significant expansion since its inception. It initially accompanied Line 6’s Phase Three. Now, it plays a critical role in the line’s western extension. The depot sprawls across 25 hectares. The buildings themselves occupy a massive 89,000 square meters. Inside, you’d find not just rows of gleaming subway cars, but a complex network of facilities. These include an operations center, a combined inspection and repair depot, areas for shunting and engineering trains, a washing line, and a testing track. There are even administrative offices and living quarters for staff. Wuliqiao Vehicle Depot is designed for efficiency. The main operations building alone can house 32 trains. The expansion, sometimes referred to as the Wuliqiao Parking Yard, added capacity for another 20 trains. This addition was crucial for accommodating the increased number of trains running on Line 6’s Phase Two. Interestingly, although the western extension was planned to be completed after Phase Two, the Wuliqiao Vehicle Depot expansion ended up opening simultaneously with Phase Two in December 2014. This was due to delays with the Dongxiaoying Vehicle Depot, originally planned for Phase Two. Its construction was hampered by demolition and relocation issues. This meant the Wuliqiao Vehicle Depot expansion had to pick up the slack, housing the new trains until Dongxiaoying was finally ready. So, next time you ride Line 6, remember the Wuliqiao Vehicle Depot, the bustling behind-the-scenes hub that keeps the trains running on time.
Центральный дом работников искусств
Step through the grand wooden doors of the Central House of the Workers of Art, and you’ll be transported to