Imagine a hidden world beneath our feet. It hums with the tireless work of the Ma On Shan Sewage Pumping Station. This facility is more than just concrete and pipes. It is a vital artery in our city’s complex system.
The Ma On Shan Sewage Pumping Station ensures the smooth flow of wastewater. It moves sewage from homes and businesses to treatment plants. Here, the water is cleaned before being released back into the environment.
In 2023, a significant contract was awarded for upstream sewerage works. This aims to improve the area’s sewage infrastructure. The project includes constructing a new intermediate sewage pumping station. It also involves rehabilitating existing rising mains from the Ma On Shan Sewage Pumping Station.
The Drainage Services Department oversees these vital projects. They work to enhance the sewage systems in Sha Tin and Ma On Shan. The goal is to increase sewage conveyance capacity. This supports the growing residential areas in Sai Sha.
The Ma On Shan Area 108 Pumping Station plays a crucial role. A new pumping station was constructed adjacent to the existing one. The existing station now serves as a standby. This ensures continuous operation. The design average dry weather flow is approximately 14500 cubic meters per day. The facility includes an underground inlet chamber and wet well.
Environmental protection is a key consideration. Measures are in place to minimize potential impacts. These include controlling dust and noise during construction. There are also measures to prevent odour and water quality issues during operation. The pumping station is equipped with a deodourizer. This removes odours. The facility also has backup systems to prevent sewage bypass into Tolo Harbour.
The location of sensitive receivers is carefully considered. Residential developments like Lee On Estate and Monte Vista are nearby. Planned developments, such as the Wu Kai Sha Station property, are also taken into account. This ensures that the Ma On Shan Sewage Pumping Station operates with minimal disruption to the community.
The upgrading of the Ma On Shan Sewage Pumping Station involved selective tendering. Only qualified contractors with experience in electrical and mechanical works were considered. This ensures that the project is completed to the highest standards.
The Ma On Shan Sewage Pumping Station stands as a testament to our commitment to public health. It showcases our dedication to environmental stewardship. The station quietly ensures that our city remains clean and sustainable for generations to come.